This MW-level system integrates storage, conversion and distribution into a high-density, All-in-One package that can run grid-connected or off-grid. PV DC access with MPPT forms a DC-coupled PV-ESS microgrid, integrated BMS/PCS/EMS control coordinates operation, and a built-in static transfer switch moves between sources in under 20 milliseconds. On-demand deployment, 4G/Wi-Fi monitoring and 1+1 parallel operation make it ready for utility and C&I microgrids.
Energy Storage
MW-Level Grid-Connected & Off-Grid System
MW-level · 1+1 parallel
1 / 1
Overview
A highly integrated, MW-scale grid-connected and off-grid energy system with PV DC access and MPPT (a DC-coupled PV-ESS microgrid), integrated BMS/PCS/EMS control, a built-in STS with sub-20 ms source switching and 1+1 parallel operation.
Entogo, a Canadian company, builds the MW-Level Grid-Connected & Off-Grid System in its own factory in China with a vertically integrated supply chain — factory-direct pricing, shipping in 16–24 weeks (within 36 weeks when the order needs new cULus/CSA certification), and a minimum 36-month manufacturer warranty backed by Entogo Inc. in Toronto.
Key features
- High power density and integration in a compact, easy-to-install package.
- Photovoltaic DC access with MPPT, forming a DC-coupled PV-ESS microgrid.
- Integrated BMS, PCS and EMS control with multiple protections.
- Built-in STS switches sources in under 20 milliseconds.
- All-in-One distribution with load, grid and PV breakers plus bypass.
- 4G / Wi-Fi monitoring and 1+1 parallel operation.
Custom-engineered · built to order
Lead time
16–24 weeks
Order now for estimated delivery Mar 2027 – May 2027.
Certification and testing may extend this, depending on the applicable standard and scope.
Keep reading
Related insights
Energy Storage
Grid-forming vs. grid-following inverters for battery storage
Grid-following inverters follow an existing grid voltage, while grid-forming inverters set their own voltage and frequency so they can ride through weak grids, island, and black-start. Here is how to tell which one a battery storage project needs and what to specify.
View
Microgrids
Do you need a microgrid? Islanding, resilience, and what to specify
Size a microgrid island from the critical load, not the service. A 282 kW cold-store load with a 75 hp code G compressor needs a 500 kVA grid-forming inverter, a 1042 kWh battery for 4 hours and a second protection settings group, because island fault current falls from 20,918 A to about 722 A.
View
Clean Energy
Related products
Clean Energy
Industrial & Commercial Liquid-Cooled Energy Storage System
An all-in-one industrial and commercial liquid-cooled energy storage system that integrates the battery cluster, BMS, EMS, PCS, liquid-cooling control and fire protection in a single cabinet for factories, commercial complexes and data centers.
View
Clean Energy
DC-Coupled Grid-Forming PV-Storage Hybrid System
A DC-coupled grid-forming / off-grid PV-storage system (PV-storage-diesel hybrid) offering seamless switchover to off-grid operation without loss of power, higher DC-coupled charging efficiency, larger installable PV capacity and external multi-channel PV MPPT in place of combiner boxes.
View
Clean Energy
Industrial & Commercial Air-Cooled Energy Storage System
An all-in-one industrial and commercial air-cooled energy storage system that integrates the battery cluster, BMS, EMS, PCS, air-conditioning control and fire protection in a single cabinet for factories, commercial complexes and data centers.
View
Request a quote