Build the guarantee schedule around the network study
A nominal voltage and MVA value do not define a power transformer. The specification must identify insulation levels, neutral treatment, impedance and cooling stages, along with the agreed test basis.
For a replacement, check parallel operation, phase displacement, tap positions and physical interfaces. For a new substation, include transport mass, dimensions, access and the division of assembly work before freezing the design.