Transformers & Substations

150 kVA three-phase pad-mounted transformer

180 A at 480 V · 416 A at 208 V · 15 / 25 / 35 kV class

Overview

A 150 kVA three-phase pad-mounted transformer is a liquid-filled, dead-front distribution transformer for ground-level medium-voltage service: a 12.47 / 13.2 / 13.8 kV (15 kV class), 24.94 kV (25 kV class) or 34.5 kV (35 kV class) primary stepping down to 208Y/120, 480Y/277 or 600Y/347 V at 60 Hz. At full load it delivers 180 A at 480 V, 416 A at 208 V or 144 A at 600 V, and draws 6.9 A from a 12.47 kV feeder. Entogo designs and builds the 150 kVA unit to IEEE C57.12.34 / C57.12.28 and DOE 10 CFR 431 in its own factory, ships engineered-to-order units in 16–24 weeks, and offers UL (cULus) / CSA certification on request.

Full-load and primary current

Three-phase line current at rated load: amperes = kVA × 1000 ÷ (√3 × V).

Full-load current of a 150 kVA three-phase transformer by voltage
Winding / voltage Full-load current
Secondary 208Y/120 V 416 A
Secondary 480Y/277 V 180 A
Secondary 600Y/347 V 144 A
Primary 12.47 kV (15 kV class, 95 kV BIL) 6.9 A
Primary 13.2 kV (15 kV class, 95 kV BIL) 6.6 A
Primary 13.8 kV (15 kV class, 95 kV BIL) 6.3 A
Primary 24.94 kV (25 kV class, 125 kV BIL) 3.5 A
Primary 34.5 kV (35 kV class, 150 kV BIL) 2.5 A

Available secondary fault current

Three-phase bolted fault at the secondary terminals with an infinite primary source: full-load amps ÷ (%Z ÷ 100). Impedance is a specifier's choice; 5.75 % is common for larger pad-mounted units, lower values below about 500 kVA. Real values are lower once the utility source impedance is included.

Available fault current of a 150 kVA transformer by impedance and secondary voltage
Impedance 208Y/120 V 480Y/277 V 600Y/347 V
4.00 % 10.4 kA 4.5 kA 3.6 kA
5.00 % 8.3 kA 3.6 kA 2.9 kA
5.75 % 7.2 kA 3.1 kA 2.5 kA

What a 150 kVA unit typically serves

  • Small commercial buildings and retail pads
  • Underground residential subdivisions (URD loops)
  • Workplace and multifamily Level 2 EV-charging hubs
  • Telecom, water and utility auxiliary sites

Typical, not prescriptive: size from the calculated load and growth margin — see how to size a transformer (kVA selection), and for EV-charging sites the service-capacity calculator.

Custom-engineered · built to order

Get a quote

Lead time

16–24 weeks

Order now for estimated delivery Feb 2027 – Apr 2027.

Certification and testing may extend this, depending on the applicable standard and scope.

FAQ

Common questions

How many amps is a 150 kVA transformer at 480 V?
A 150 kVA three-phase transformer delivers 180 A at 480 V full load (kVA × 1000 ÷ (√3 × 480)). At 208 V the same unit delivers 416 A and at 600 V 144 A.
What is the primary current of a 150 kVA pad-mounted transformer?
On a 12.47 kV feeder a 150 kVA unit draws 6.9 A at full load; on 13.8 kV 6.3 A, on 24.94 kV 3.5 A and on 34.5 kV 2.5 A.
How much fault current can a 150 kVA transformer deliver?
With an infinite primary source, a 150 kVA unit at 480 V and 5.75 % impedance can deliver about 3.1 kA of three-phase bolted-fault current (full-load amps ÷ 0.0575). The real value is lower once the utility's source impedance is included; the switchgear downstream must be rated for the study value, not this ceiling.
How long does a 150 kVA pad-mounted transformer take to deliver from Entogo?
150 kVA pad-mounted units are engineered to order and ship from Entogo's own factory in 16–24 weeks — against the one-to-four-year lead times common in the North-American merchant market. If the order needs new cULus/CSA certification, delivery is within 36 weeks.

Configure & quote

Specify your 150 kVA pad-mounted transformer and get a quote.

Offline

Customer support

Offline

Our customer support team is currently offline. Please email us with your question or project details.

contact@entogo.ca

Email our team