Transformers & Substations

750 kVA three-phase pad-mounted transformer

902 A at 480 V · 2,082 A at 208 V · 15 / 25 / 35 kV class

Overview

A 750 kVA three-phase pad-mounted transformer is a liquid-filled, dead-front distribution transformer for ground-level medium-voltage service: a 12.47 / 13.2 / 13.8 kV (15 kV class), 24.94 kV (25 kV class) or 34.5 kV (35 kV class) primary stepping down to 208Y/120, 480Y/277 or 600Y/347 V at 60 Hz. At full load it delivers 902 A at 480 V, 2,082 A at 208 V or 722 A at 600 V, and draws 34.7 A from a 12.47 kV feeder. Entogo designs and builds the 750 kVA unit to IEEE C57.12.34 / C57.12.28 and DOE 10 CFR 431 in its own factory, ships engineered-to-order units in 16–24 weeks, and offers UL (cULus) / CSA certification on request.

Full-load and primary current

Three-phase line current at rated load: amperes = kVA × 1000 ÷ (√3 × V).

Full-load current of a 750 kVA three-phase transformer by voltage
Winding / voltage Full-load current
Secondary 208Y/120 V 2,082 A
Secondary 480Y/277 V 902 A
Secondary 600Y/347 V 722 A
Primary 12.47 kV (15 kV class, 95 kV BIL) 34.7 A
Primary 13.2 kV (15 kV class, 95 kV BIL) 32.8 A
Primary 13.8 kV (15 kV class, 95 kV BIL) 31.4 A
Primary 24.94 kV (25 kV class, 125 kV BIL) 17.4 A
Primary 34.5 kV (35 kV class, 150 kV BIL) 12.6 A

Available secondary fault current

Three-phase bolted fault at the secondary terminals with an infinite primary source: full-load amps ÷ (%Z ÷ 100). Impedance is a specifier's choice; 5.75 % is common for larger pad-mounted units, lower values below about 500 kVA. Real values are lower once the utility source impedance is included.

Available fault current of a 750 kVA transformer by impedance and secondary voltage
Impedance 208Y/120 V 480Y/277 V 600Y/347 V
4.00 % 52.0 kA 22.6 kA 18.0 kA
5.00 % 41.6 kA 18.0 kA 14.4 kA
5.75 % 36.2 kA 15.7 kA 12.6 kA

What a 750 kVA unit typically serves

  • Large commercial and institutional buildings
  • Campus and data-centre distribution rows
  • DC fast-charging sites with two to four 150 kW chargers
  • Commercial & industrial battery-storage interconnection

Typical, not prescriptive: size from the calculated load and growth margin — see how to size a transformer (kVA selection), and for EV-charging sites the service-capacity calculator.

Custom-engineered · built to order

Get a quote

Lead time

16–24 weeks

Order now for estimated delivery Jan 2027 – Mar 2027.

Certification / testing may extend this per the standard and scope.

FAQ

Common questions

How many amps is a 750 kVA transformer at 480 V?
A 750 kVA three-phase transformer delivers 902 A at 480 V full load (kVA × 1000 ÷ (√3 × 480)). At 208 V the same unit delivers 2,082 A and at 600 V 722 A.
What is the primary current of a 750 kVA pad-mounted transformer?
On a 12.47 kV feeder a 750 kVA unit draws 34.7 A at full load; on 13.8 kV 31.4 A, on 24.94 kV 17.4 A and on 34.5 kV 12.6 A.
How much fault current can a 750 kVA transformer deliver?
With an infinite primary source, a 750 kVA unit at 480 V and 5.75 % impedance can deliver about 15.7 kA of three-phase bolted-fault current (full-load amps ÷ 0.0575). The real value is lower once the utility's source impedance is included; the switchgear downstream must be rated for the study value, not this ceiling.
How long does a 750 kVA pad-mounted transformer take to deliver from Entogo?
750 kVA pad-mounted units are engineered to order and ship from Entogo's own factory in 16–24 weeks. If the order needs new UL (cULus) or CSA certification, delivery is guaranteed within 36 weeks — against the one-to-four-year lead times common in the North-American merchant market.

Configure & quote