Transformers & Substations

500 kVA three-phase pad-mounted transformer

601 A at 480 V · 1,388 A at 208 V · 15 / 25 / 35 kV class

Overview

A 500 kVA three-phase pad-mounted transformer is a liquid-filled, dead-front distribution transformer for ground-level medium-voltage service: a 12.47 / 13.2 / 13.8 kV (15 kV class), 24.94 kV (25 kV class) or 34.5 kV (35 kV class) primary stepping down to 208Y/120, 480Y/277 or 600Y/347 V at 60 Hz. At full load it delivers 601 A at 480 V, 1,388 A at 208 V or 481 A at 600 V, and draws 23.1 A from a 12.47 kV feeder. Entogo designs and builds the 500 kVA unit to IEEE C57.12.34 / C57.12.28 and DOE 10 CFR 431 in its own factory, ships engineered-to-order units in 16–24 weeks, and offers UL (cULus) / CSA certification on request.

Full-load and primary current

Three-phase line current at rated load: amperes = kVA × 1000 ÷ (√3 × V).

Full-load current of a 500 kVA three-phase transformer by voltage
Winding / voltage Full-load current
Secondary 208Y/120 V 1,388 A
Secondary 480Y/277 V 601 A
Secondary 600Y/347 V 481 A
Primary 12.47 kV (15 kV class, 95 kV BIL) 23.1 A
Primary 13.2 kV (15 kV class, 95 kV BIL) 21.9 A
Primary 13.8 kV (15 kV class, 95 kV BIL) 20.9 A
Primary 24.94 kV (25 kV class, 125 kV BIL) 11.6 A
Primary 34.5 kV (35 kV class, 150 kV BIL) 8.4 A

Available secondary fault current

Three-phase bolted fault at the secondary terminals with an infinite primary source: full-load amps ÷ (%Z ÷ 100). Impedance is a specifier's choice; 5.75 % is common for larger pad-mounted units, lower values below about 500 kVA. Real values are lower once the utility source impedance is included.

Available fault current of a 500 kVA transformer by impedance and secondary voltage
Impedance 208Y/120 V 480Y/277 V 600Y/347 V
4.00 % 34.7 kA 15.0 kA 12.0 kA
5.00 % 27.8 kA 12.0 kA 9.6 kA
5.75 % 24.1 kA 10.5 kA 8.4 kA

What a 500 kVA unit typically serves

  • Large commercial and institutional buildings
  • Campus and data-centre distribution rows
  • DC fast-charging sites with two to four 150 kW chargers
  • Commercial & industrial battery-storage interconnection

Typical, not prescriptive: size from the calculated load and growth margin — see how to size a transformer (kVA selection), and for EV-charging sites the service-capacity calculator.

Custom-engineered · built to order

Get a quote

Lead time

16–24 weeks

Order now for estimated delivery Feb 2027 – Apr 2027.

Certification and testing may extend this, depending on the applicable standard and scope.

FAQ

Common questions

How many amps is a 500 kVA transformer at 480 V?
A 500 kVA three-phase transformer delivers 601 A at 480 V full load (kVA × 1000 ÷ (√3 × 480)). At 208 V the same unit delivers 1,388 A and at 600 V 481 A.
What is the primary current of a 500 kVA pad-mounted transformer?
On a 12.47 kV feeder a 500 kVA unit draws 23.1 A at full load; on 13.8 kV 20.9 A, on 24.94 kV 11.6 A and on 34.5 kV 8.4 A.
How much fault current can a 500 kVA transformer deliver?
With an infinite primary source, a 500 kVA unit at 480 V and 5.75 % impedance can deliver about 10.5 kA of three-phase bolted-fault current (full-load amps ÷ 0.0575). The real value is lower once the utility's source impedance is included; the switchgear downstream must be rated for the study value, not this ceiling.
How long does a 500 kVA pad-mounted transformer take to deliver from Entogo?
500 kVA pad-mounted units are engineered to order and ship from Entogo's own factory in 16–24 weeks — against the one-to-four-year lead times common in the North-American merchant market. If the order needs new cULus/CSA certification, delivery is within 36 weeks.

Configure & quote

Specify your 500 kVA pad-mounted transformer and get a quote.

Offline

Customer support

Offline

Our customer support team is currently offline. Please email us with your question or project details.

contact@entogo.ca

Email our team