Match the converter and the grid interface
Active power in MW alone does not establish transformer MVA. Include reactive-power requirements, converter current limits and the expected operating cycle. A PV generation profile and a storage charge/discharge profile can create different thermal duties.
For multiple inverter outputs, define the required LV windings and phase displacement. Keep the transformer scope distinct from a complete skid substation containing switching, auxiliaries and structural integration.